Directional Drilling, Horizontal Directional Drilling, Trenchless Technology, No Dig, Pipe Bursting & Microtunneling are just some of the professional HDD services provided by horizontal directional drilling contractor, Strega Company Ltd, Bangkok, Thailand
Directional Drilling Asia
Horizontal Directional Drilling, Thailand

No Dig Technology Asia

Strega HDD - English
Strega HDD Home
Directional Drilling, Thailand, Strega.co.th
Horizontal Directional Drilling, Thailand, Strega.co.th
Trenchless Technology, Thailand, Strega.co.th
No Dig, Thailand, Strega.co.th
Pipe Bursting, Thailand, Strega.co.th
Microtunneling, Thailand, Strega.co.th
Directional Drilling Companies, Thailand, Strega.co.th
HOME ABOUT US WHAT'S NEW?
OUR SERVICES directional drilling, horizontal directional drilling, trenchless technology, no dig, pipe bursting, microtunneling, HDD, nodig, pipe ramming, no-dig, no dig technology, horizontal directional drilling companies, HDD contractors, directional drilling company, river crossing, directional drilling contractors, HDD services, Vermeer, Bangkok, Thailand, Asia, Strega, Strega.co.th OUR EQUIPMENT
OUR CLIENTS LINKS CONTACT US

- Digital Control Incorporated
- HDD Magazine
- HDD Broker
- Trenchless Buyers
- Trenchless Online
- Tunneling Online
- No Dig Engineering
- No Dig International
- Trenchless

[more links]

- Vermeer

[more links]

Vermeer - Horizontal Directional Drilling Equipment
 
  Works
Completed Crossings
Client List
No Dig Technology Asia

Completed Crossings

Strega completed projects 2003 details as follows:

2003


2003
Project
Client
Project/Owner
m
Type
Completion
Nakorn Pathom-Samut Sakorn WS no. 34 Thames Water Int. (Thailand) Ltd. PWA
333
110 & 560 HDPE PN10 15-Dec-03
PTT NGD Gas PLAmatanakorn IE (sm. crossings) JFE Engineering PTT NGD
1,882.50
6,8,10” PVC 30-Nov-03
PTT NGD Gas PL Amatanakorn IE (motrorway) JFE Engineering PTT NGD
400
12” Steel 24-Oct-03
PTT NGD Gas PL Navanakorn IE (sm. crossings) JFE Engineering PTT NGD
128
12” PVC 30-Sep-03
SBIA Hydrant Network Project Ch.Karnchang  
280
24” Steel 14-Aug-03
SBIA Hydrant Network Project Ch.Karnchang  
280
24” Steel 03-Aug-03
PTT NGD Gas PL – Amatanakorn IE NKK Engineering PTT NGD
1545.4
6, 8, 10” PVC 29-Jul-03
SBIA Hydrant Network Project Ch.Karnchang  
280
HDPE 6x110mmPN10 15-Jul-03
Core Cable Replacement Nava Nakhon-Ayudhya Sumitomo TOT
4,000
  07-Jul-03
PTT NGD Gas PL- Ladkrabang IE JFE Engineering PTT NGD
47
8” PVC 18-Jun-03
Puttamonton Road Drill Max TOT
675
HDPE 450 mm 01-Jun-03
Underground Duct Bank at Bangsamak Siemens PEA
324
HDPE 2x160 4x160 16-May-03
PTT NGD Gas PL- Bang Pu IE JFE Engineering PTT NGD
67.7
8” PVC 13-May-03
Klong Dan Substation Thai Nasa TOT
181.47
HDPE 6x125 mm 12-Apr-03
PTT NGD Gas PL- Rojana Ayudhya IE JFE Engineering PTT NGD
103
10” PVC 26-Mar-03
New Bangkok Airp. Saengpradit New Bangkok Airp.
22
HDPE 2x110 20-Mar-03
PTT NGD Gas PL – Amata City IE NKK Engineering PTT NGD
615.05
6, 8, 10” PVC 28-Feb-03
Soi Baring-Srinakarin Extention Road Project Boonchai Panich BMA
70.5
HDPE 12x125 mm 18-Feb-03
EGAT Krabi Cross Country NKK Engineering EGAT
1,400
12” steel 04-Feb-03

No Dig Technology Asia

 
www.strega.co.th
the HORIZONTAL DIRECTIONAL DRILLING resource website
|
|
|
|
|
|
|
|

Copyright © 1999 - 2010 : STREGA COMPANY LTD : All Rights Reserved

Web Design, Web Hosting, Web Marketing - ThaiWebpro.com
Site developed by : www.thaiwebpro.com