Directional Drilling, Horizontal Directional Drilling, Trenchless Technology, No Dig, Pipe Bursting & Microtunneling are just some of the professional HDD services provided by horizontal directional drilling contractor, Strega Company Ltd, Bangkok, Thailand
2. Lam
Chabang Industrial Estate Gas Pipeline Project
PROJECT
DETAILS:
Client:
Kikuchi
Owner:
PTT
Project Location:
Lam Chabang Industrial Estate
Project Duration:
2 May 2001 - 21 May 2001
Pipe:
6" and 8" Synergy wrapped
steel
Pipe OD:
# Installations:
12
HDD Lengths:
19 - 101 meters
Drill:
D80 x 100
THE CHALLENGE:
In
May 2001, Strega was enlisted to install two parallel
steel gas pipelines totally 296 meters for PTT. The
type of HDD project is unusual in Thailand and required
an extremely high degree of accuracy as the six- and
eight-inch steel pipes had to be installed within one
meter of each other.
THE SOLUTION:
Laying
parallel pipe requires very careful pre-bore planning
and crews that are specially trained in using cable
transmitters or "locators". Strega's crew
followed the bore plan and monitored the position of
the drill head for the entire length of the bore with
pinpoint accuracy. Afterwards, the pipe was successfully
pulled through the pilot holes.
Horizontal Directional Drilling Thailand
www.strega.co.th the HORIZONTAL DIRECTIONAL DRILLING resource website