Directional Drilling, Horizontal Directional Drilling, Trenchless Technology, No Dig, Pipe Bursting & Microtunneling are just some of the professional HDD services provided by horizontal directional drilling contractor, Strega Company Ltd, Bangkok, Thailand
Directional Drilling Asia
Horizontal Directional Drilling, Thailand

Horizontal Directional Drilling Company Thailand

Strega HDD - English
Strega HDD Home
Directional Drilling, Thailand, Strega.co.th
Horizontal Directional Drilling, Thailand, Strega.co.th
Trenchless Technology, Thailand, Strega.co.th
No Dig, Thailand, Strega.co.th
Pipe Bursting, Thailand, Strega.co.th
Microtunneling, Thailand, Strega.co.th
Directional Drilling Companies, Thailand, Strega.co.th
HOME ABOUT US WHAT'S NEW?
OUR SERVICES directional drilling, horizontal directional drilling, trenchless technology, no dig, pipe bursting, microtunneling, HDD, nodig, pipe ramming, no-dig, no dig technology, horizontal directional drilling companies, HDD contractors, directional drilling company, river crossing, directional drilling contractors, HDD services, Vermeer, Bangkok, Thailand, Asia, Strega, Strega.co.th OUR EQUIPMENT
OUR CLIENTS LINKS CONTACT US

- Digital Control Incorporated
- HDD Magazine
- HDD Broker
- Trenchless Buyers
- Trenchless Online
- Tunneling Online
- No Dig Engineering
- No Dig International
- Trenchless

[more links]

- Vermeer

[more links]

Vermeer - Horizontal Directional Drilling Equipment
 
Job Gallery
Gallery Index
Samyan Tunnel
Lam Chabang
Bang Bo
Navankorn
Horizontal Directional Drilling Company Thailand
4. Navanakorn Natural Gas Pipeline Project

Client:

NKK Engineering Thailand

Owner:

PTT NGD

Project Location:

Navanakorn

Project Duration:

10 January 2002 - 19 March 2002

Pipe:

12" FBE coated steel

Pipe OD:

 

# Installations:

5

HDD Lengths:

3 x 36, 175 and 285 meters

Drill:

D80 x 100

In January 2002, NKK Engineering (Thailand) hired Strega to complete five HDD installations, totally 568 meters, as part of its gas pipeline project. The most difficult and longest crossing was 285 meters, which included drilling beneath two canals, a road, and a railway.

Navanakorn Natural Gas Pipeline Project
Navanakorn Natural Gas Pipeline Project Navanakorn Natural Gas Pipeline Project
Navanakorn Natural Gas Pipeline Project
Navanakorn Natural Gas Pipeline Project

Crossing under the railway foundation pilings required drilling to an unusual depth of 23 meters. This depth can make "walkovers locators", or monitoring of the drill head placement to ensure accuracy, difficult. Strega used Vermeer's Terrain Mapping System and Atlas Bore PlannerT software to create a topographical map and detailed bore plan. The crew also used a DCI Mach III cable transmitter for the locating system, and a Vermeer D80 x 100 NAVIGATOR HDD drill to ensure the pipeline's safe and successful placement beneath all underground obstacles.

Navanakorn Natural Gas Pipeline Project

Horizontal Directional Drilling Company Thailand

 
www.strega.co.th
the HORIZONTAL DIRECTIONAL DRILLING resource website
|
|
|
|
|
|
|
|

Copyright © 1999 - 2010 : STREGA COMPANY LTD : All Rights Reserved

Web Design, Web Hosting, Web Marketing - ThaiWebpro.com
Site developed by : www.thaiwebpro.com