Directional Drilling, Horizontal Directional Drilling, Trenchless Technology, No Dig, Pipe Bursting & Microtunneling are just some of the professional HDD services provided by horizontal directional drilling contractor, Strega Company Ltd, Bangkok, Thailand
Directional Drilling Asia
Horizontal Directional Drilling, Thailand

Horizontal Directional Drilling Companies Asia

Strega HDD - English
Strega HDD Home
Directional Drilling, Thailand, Strega.co.th
Horizontal Directional Drilling, Thailand, Strega.co.th
Trenchless Technology, Thailand, Strega.co.th
No Dig, Thailand, Strega.co.th
Pipe Bursting, Thailand, Strega.co.th
Microtunneling, Thailand, Strega.co.th
Directional Drilling Companies, Thailand, Strega.co.th
HOME ABOUT US WHAT'S NEW?
OUR SERVICES directional drilling, horizontal directional drilling, trenchless technology, no dig, pipe bursting, microtunneling, HDD, nodig, pipe ramming, no-dig, no dig technology, horizontal directional drilling companies, HDD contractors, directional drilling company, river crossing, directional drilling contractors, HDD services, Vermeer, Bangkok, Thailand, Asia, Strega, Strega.co.th OUR EQUIPMENT
OUR CLIENTS LINKS CONTACT US

- Digital Control Incorporated
- HDD Magazine
- HDD Broker
- Trenchless Buyers
- Trenchless Online
- Tunneling Online
- No Dig Engineering
- No Dig International
- Trenchless

[more links]

- Vermeer

[more links]

Vermeer - Horizontal Directional Drilling Equipment
 
  What's New
Company News
Engineering News
Oil & Gas News
Construction News
Horizontal Directional Drilling Companies Asia

Company News
2007
February 1, 2007

Our third pilot hole using the ParaTrack II guidance system has been completed. The crossings involve drilling parallel to and across an existing 42" steel gas pipeline. Because of the close proximately to the existng pipeline and the depth of the pilot hole, traditional walkover guidance would have struggled to locate the drill path. The ParaTrack II effortlessly completed the pilot holes without incident.

FOR MORE INFORMATION :
January 30, 2007

We have completed our first crossing using ParaTrack II. Strega would
like to thank John Teer and Ruud van Haren of Prime Horizontal for their
assistance in getting us up and running with the ParaTrack guidance system.

FOR MORE INFORMATION :
January 18, 2007

Strega is pleased to announce that we have taken delivery of a new
Vermeer D80 x 100 Series II. This machine is to replace the company's
older first generation D80 x 100.

FOR MORE INFORMATION :
January 30, 2007


Strega welcomes Mr. Bundit Sucharitchandra as the company's new
operations manager. Mr. Bundit brings with him a wealth of construction
industry experience.

FOR MORE INFORMATION :
2006
December 27, 2006

Strega is pleased to announce that we have taken delivery of a new
ParaTrack II HDD guidance system. The ParaTrack II compliments and
enhances Strega's guidance capabilities. This new system will allow
Strega to complete jobs that were previously considered to be difficult
or impossible to complete using traditional walkover locating systems.
Between the ParaTrack II and the DCI Eclipse systems Strega now has the
ability to complete a wide variety of crossing.

FOR MORE INFORMATION :
August 30, 2006
Sai Noi North/South Bangkok power plant pipeline project

The company has just completed it largest contract to date. Between August 2005 and August 2006 Strega installed a total of 25,124 metres of 6 inch steel fiber optic conduit on the Sai Noi North/South Bangkok power plant pipeline project. Strega was subcontracted to Nacap Asia Pacific to complete the FOC HDD works. "It has been a good project for us" says John Barton, Managing Director of Strega. "This project has set a number of accomplishments for the company. Our longest crossing of 1,100 metres was achieved on this job
using our Vermeer D80, a 40 tonne machine, something that quite a few
people said would be impossible. By paying attention to a number of
factors we were able to easily do over 1,000 metres at four locations."

FOR MORE INFORMATION :
August 15, 2006
Click to View - Nodig-construction.com

Click to View - Trenchlessaustralasia.com

We have been published!... for details see:

www.nodig-construction.com
or click here to download a PDF copy of the publication.


and


www.trenchlessaustralasia.com
or click here to download a PDF copy of the publication.

FOR MORE INFORMATION :
June 27, 2006
Click to View - Ground Breaking Ceremony

Ground breaking ceremony. Today Strega celebrated the new office and workshop facilities ground breaking ceremony. The first pile for the workshop was driven at precisely 09:11. The 288 square metre office and 432 square metre workshop is scheduled to be completed at the end of November 2006.

FOR MORE INFORMATION :
March 29, 2006
Click to View - first major HDD rock project

Strega have just completed their first major HDD rock project. The project involved the installation of a 350 metre long  450 mm HDPE pipe through 100 MPa rock.

FOR MORE INFORMATION :
28 January, 2006
Click to View - Delivery of their latest HDD rig


Click to View - Delivery of their latest HDD rig

Strega have just taken delivery of their latest HDD rig, an American Augers DD140B drill with a American Augers MP 400 mud system.

The DD140B was purchased specifically to complete a river crossing through rock in central Thailand.

FOR MORE INFORMATION :
2005
2/03/05

Strega was recently awarded a contract to install two 24 inch and one 12
inch steel fuel pipes under the new Suvarnabhumi Airport runways. Each
24 inch pipe will have a length of approximately 66 metres and the 12
inch will be approximately 32 metres long. Due to concerns of  damage to
the new runways Strega has elected to use pipe ramming instead of HDD as
the method to install the two pipes. A 16 inch and 5 3/4 inch Hammerhead
mole will be used to install the pipes.

FOR MORE INFORMATION :
1/02/05

Strega have moved to new offices. Please note our new address and contact numbers are now:

Strega Company Limited
61/13-14 Moo6, Lamlukka Road
Bung-kam-proi, Lamlukka
Patumthani 12150,
THAILAND

Tel: (662) 987 9552-4
Fax: (662) 987 9556

FOR MORE INFORMATION :
2004
16/07/04

Strega has been awarded a small works contract by Nacap Drilling. The project will involve the installation of a bundled 8 inch steel pipe and 6 inch HDPE pipe.

FOR MORE INFORMATION :
10/07/04

Strega purchases new drill. Due to the increased work load of upcoming projects Strega today took delivery of  a used Vermeer D50 x 100. The drill is expected to be used on projects involving crossings with lengths of up to 580 metres and diameters of up to 18 inches.

FOR MORE INFORMATION :
2/07/04

Strega is pleased to announce that it has been award the main directional drilling contract for the Thappline Suvarnabhumi Airport Dedicated Line Project. The main contractor, ITD-NSC Joint Venture awarded the contract on 1st of July 2004. The contract will involve the installation of over 3,000 metres of 18 inch steel fuel pipe.

FOR MORE INFORMATION :
15/05/04

Strega has just been awarded the contract for the installation of over 9,500 metres of  four inch steel pipe in Chachoengsao, Thailand. The contract specifies that the entire project must be completed using directional drilling. The directional drilling works must be completed with in 60 days of starting the on site works.

FOR MORE INFORMATION :
2003
10/10/03

To increase the directional drilling locating capabilities, Strega has just taken delivery of the new DCI SST locating system. The new system uses a wireline to send the the drillhead information to the drill operator. Unlike older systems, SST system does not need the locater operator to be directly above the drillhead to receive information from the transmitter. With the new SST Strega now has the capability to complete difficult crossings such as roads and wide rivers with better accuracy and confidence.

FOR MORE INFORMATION :
2002
17/05/02

Strega has purchased a Vermeer D16 x 20a directional boring machine to expand its capability for smaller jobs. The D16 x 20a NAVIGATOR is a powerful, small machine. It will allow Strega to more easily drill in small, congested spaces, such as across busy roads and highways in the city.

“Three years ago, we started out as a big drill contractor, but we are now expanding our range to provide greater service to our customers. The D16 allows us to do some of the smaller, shorter work for our customers that we couldn’t do physically or cost-effectively with a large drill,” says John Barton, Managing Director.

FOR MORE INFORMATION :

Horizontal Directional Drilling Companies Asia

 
www.strega.co.th
the HORIZONTAL DIRECTIONAL DRILLING resource website
|
|
|
|
|
|
|
|

Copyright © 1999 - 2010 : STREGA COMPANY LTD : All Rights Reserved

Web Design, Web Hosting, Web Marketing - ThaiWebpro.com
Site developed by : www.thaiwebpro.com